| DISC-LOCK Tension Control Bolt |
INSTALLATION PROCEDURES
- First assemble the bolt and nut into the connection hole and "finger-tighten" the nut.
- Engage the twelve point socket of the installation tool on the Rapid Tension bolt and push on the tool to engage the outer socket over the nut.
- Rapid Tension is achieved by pressing the trigger of the installation tool. While the outer socket rotatesclockwise, the inner socket will rotate counter-clockwise ensuring a tight fit. When the proper tension of the bolt has been reached, the end spline of the bolt will separate from the bolt.
- Disengage the installation tool from the fastener and depress the discharge lever to remove the bolt spline from the socket.
INSPECTION PROCEDURE
Rapid Tension is visually inspected. Installation is complete and the proper tension achieved if the spline has been separated from the Rapid Tension bolt.
|